The coating is applied directly to the desired area from the outside. After appropriate cleaning of the surface to be treated, the paint can be applied in a two-coat process. This consists of the upstream primer and the subsequent application of the paint itself. If a temperature indicating paint has already been applied, this must first be completely removed.

Detailed operating instructions will come with the coating, as they may differ from one product to the other.